Do You Understand The Operating Procedures Of Colloid Mill?

May 20, 2025|

I. Operating Procedures
1. Preparation:
(1) Check the cleanliness of the colloid mill and the integrity of each component.
(2) Prepare a container for holding materials.
(3) Check the gap between the fixed teeth and the rotating teeth to ensure that the gap is not at the minimum state. Clockwise (looking down) is for smaller adjustment, and counterclockwise is for larger adjustment.

 

industrial peanut butter machine

 

Model Voltage Power KW Output KG/h Weight KG Dimensions (mm)
Gn-50 380/50HZ 220V/1.5 10-30 65 610*400*700
GN-80 380/50HZ 4 50-100 210 850*450*930
GN-110 380/50HZ 7.5 100-200 300 850*450*1000
GN-130 380/50HZ 11 200-300 350 1000*500*1200
GN-180 380/50HZ 18.5 500-800 420 1050*550*1250
GN-220 380/50HZ 30 600-900 480 1080*600*1300
GN-240 380/50HZ 37/45 1000-1500 1300 1400*600*1350
GN-300 380/50HZ 75/90 3000-5000 1600 1500*700*1450


2. Turn on the machine: Turn on the power.
3. Grinding: First rinse the pipe with clean water. When the outflowing water is clear, switch to adding materials. First, let a small amount of material flow into the lower hopper, adjust the gap adjustment sleeve, and determine the grinding gap (be careful not to get stuck).
4. Cleaning: After the grinding is completed, adjust the gap to the maximum, clean the pipe with pure water above 90°C for 5 minutes, and stop the machine only after the material residue and hot water are drained.
5. Shutdown: Cut off the power supply and clean the surrounding area of ​​the instrument and equipment.
II. Precautions
1. When the machine is running, pay attention to check the temperature of each part and do not open it for a long time.
2. After use, clean the inside and outside of the equipment in time to ensure clean water handover.
3. Before and after use, clean the pipes with pure water above 90°C.
4. Cut off the power immediately if any problem occurs.