Jam Processing Machine
model
50 85 130
power
1.5kw 5.5kw 7.5kw
No-load speed
No-load speed
- Product Introduction
Product Introduction
This tutorial guides the safe disassembly and installation of the colloid mill, emphasizing safety matters, power-off operation and clean environment. The disassembly and installation steps are listed in detail, including preparing tools, power off, disassembling parts, cleaning, installing and checking connections. The importance of regular maintenance is emphasized, and if you encounter problems, you should consult a professional. Or you can consult us directly. We are a professional food machinery and equipment manufacturer. The quality of our products is guaranteed. We understand products and services and can provide you with the equipment and services you want.
Product Parameters
| model | capacity | power | No-load speed | size |
| 50 | 0.005-0.3t/h | 1.5kw | 2900r/min | 600*300*700mm |
| 85 | 0.2-2t/h | 5.5kw | 2900r/min | 800*350*950mm |
| 130 | 0.2-4t/h | 7.5kw | 2900r/min | 900*400*1000mm |
| 180 | 0.8-6.0t/h | 15kw | 2900r/min | 1100*500*1100mm |
| 210 | 4-15t/h | 22kw | 2600r/min | 1200*500*1400mm |

Precautions
1. Safety: Always wear appropriate personal protective equipment such as gloves, goggles and masks before operation.
2. Power-off operation: Before disassembly or installation, always disconnect the power supply to avoid accidental start-up.
3. Clean environment: Make sure the working area is clean and avoid dust and debris from entering the equipment.
Make sure the equipment is disconnected from the power supply and marked as "No Operation".
* Use a screwdriver to remove the fixing screws of the upper cover.
* Remove the upper cover carefully to avoid damaging the sealing ring.
* Use a wrench to remove the fixing nut of the rotor.
* Carefully remove the rotor and its accessories and place them on a clean workbench.
* Remove the bolts around the grinding chamber.
* Remove the grinding chamber carefully to ensure that the sealing surface is not damaged.
* After disassembly, check the wear of all parts and replace damaged parts if necessary.
* Clean all disassembled parts with a clean cloth to ensure that there is no dust and debris.
* Align the grinding chamber with the base and fix it with bolts to ensure that the sealing surface is good.
* Put the rotor into the grinding chamber and fix the nut with a wrench to ensure that the rotor is firmly fixed.
* Put the upper cover back in place and use a screwdriver to fix the screws of the upper cover to ensure that the sealing ring is in place.
* Make sure that all connections are not loose and the cables and pipes are connected correctly.
* Connect the power supply and conduct a trial run to check whether the equipment is operating normally.

Our Advantages
150
+
Number Of Employees
3000㎡+
Factory Area
10
+
Years Of Experience
800㎡+
Company Area
Qualifications and Honors

Hot Tags: jam processing machine, China jam processing machine manufacturers, factory, peanut butter storage process, peanut butter housings, peanut butter repair system, peanut butter upgrade system, Ketchup Making Machine, peanut butter safety system












